You are here

Evaluation Tools | Cypress Semiconductor

CAUTION WHEN CONNECTING ICE AND YOUR TARGETSYSTEM

When connecting host PC, emulator and targetsystem, take care of voltage difference between signal gnd of emulator and signal gnd of target system.If the voltage difference exists among them, isolation of frame gnd of the system is needed before starting debug session.

CAUTION EMULATOR SYSTEM GROUND(60KB)