Knowledge Base Article
The CY8CPLC20 PLC Development Kits require firmware to be programmed onto the boards for them to work with the PLC Control Panel, unlike the CY8CPLC10 PLC Evaluation Kits which support the Control Panel out of the box. Follow the steps listed below to setup your board to work with the GUI.